1. The Infiltration Challenge of Flush Sills
Traditional building codes require a 50mm to 100mm raised door step to prevent rainwater from being blown beneath exterior doors. Eliminating this step to create a single continuous floor plane creates serious water management challenges if poorly detailed.
Achieving a true zero-threshold requires treating the transition zone not as a simple door frame, but as a sophisticated hydraulic drainage structure.